arrow_back_ios Back View more articles
Sustainable design, engineering, and consultancy solutions firm Arcadis has signed a 10-year lease for office space at Assembly Bristol.

Assembly Bristol welcomes Arcadis to tenant mix

Sustainable design, engineering, and consultancy solutions firm Arcadis has signed a 10-year lease for office space at Assembly Bristol.

Arcadis will occupy 7,821 sq. ft. on the sixth floor of Building C.

Assembly Bristol is the city’s flagship mixed-use regeneration scheme developed by AXA IM Alts, a global leader in alternative investments with over €188 billion of assets under management.

A premier commercial development comprising three buildings over eight levels, Assembly Bristol offers Grade A flexible and smart workspaces ranging between 3,147 to 77,000 sq. ft.

The deal with Arcadis follows two similar deals in October: Ryan, a global tax services and software provider, and Kaluza, an energy industry software specialist, both of which signed for 10-year leases for space in the building.

Strategically positioned on the waterfront in the heart of the city, Assembly Bristol combines a state-of-the art workplace with flexible floorplates and an abundance of natural light set in a beautifully landscaped environment, with a waterside setting and thoughtful amenities – such as rooftop views and flexible event spaces – designed to help those working in the buildings stay happy and healthy.

The deal was secured by Savills and JLL, with Cushman & Wakefield representing Arcadis.

Chris Meredith, director in office agency at Savills Bristol, says: “Bristol’s office market has recently experienced a flurry of activity, placing it at the forefront of the Big 6 regional cities.

“This third deal in two months underscores unparalleled levels of demand and the strength of occupier confidence in the city’s prime office stock, with limited availability making Assembly Bristol one of the most sought-after developments in the region.”

Forvis Mazars takes eighth floor of Bristol’s Assembly Building C

Read more

30.01.2025

Twisted lamp posts and telephone box join knotted pillar box outside Bristol offices

Read more

15.10.2024

Final phase of Bristol regeneration scheme complete

Read more

01.08.2024

Assembly Bristol unveils new tenant clubroom created by Interaction

Read more

11.03.2024

Nordic Semiconductor takes space at flagship Assembly Bristol scheme

Read more

06.02.2023

Business Biscuit
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.