Work on Bristol’s new railway station steps up a gear, as platform construction begins at Ashley Down
Network Rail has begun a more intensive phase of the construction of the brand-new north Bristol station at Ashley Down, with teams working around the clock until June 16 to install two new platforms.
The station at Ashley Down is one of seven new stations in Bristol that will be built as part of the West of England Combined Authority-funded MetroWest programme, which aims to improve capacity and connectivity in the region, giving 80,000 more people access to train services.
These upgrades are partly enabled by improvements made to the existing rail network in recent years, including the installation of a new, modern signalling system in and around Bristol Temple Meads, the addition of two new railway lines between Bristol Temple Meads and Filton Abbey Wood and the upgrade of Bristol East Junction.
Michael Contopoulos, Network Rail’s project director, said: “This is an exciting time for rail travel in the West of England, with a new station – funded by the West of England Combined Authority – being built at Ashley Down in Bristol.
“This will be a very intensive period of the build programme and I’d like to thank local residents for their patience over the next few weeks, in particular.
“We’ll be working 24/7 for 16 days, removing and realigning the track before installing the two new platforms, constructed from pre-fabricated blocks.
“During this period we’ll also be working on the foundations for the footbridge and lifts that will be installed in follow up shifts later this year.
“As with any project of this scale, some disturbance is unavoidable, however I’d like to assure residents that we’re doing all we can to keep this to a minimum.”
Councillor Don Alexander, cabinet member for transport at Bristol City Council, said: “Working with Network Rail and the West of England Combined Authority, we’re delivering Bristol’s first new train stations in almost a century.
“Expanding the local rail network through the MetroWest programme will increase both the capacity of the network and the accessibility of our local rail services, as we build towards the mass transit system that Bristolians need and deserve.
“As work on the Ashley part of the line continues, we are also working towards delivering two new stations on a re-opened Henbury Line – and pushing for stations at St Anne’s and Ashton Gate too.”
The 16-day period of intensive construction work that begins on Saturday 3 June will impact local services between Filton Abbey Wood and Stapleton Road.
Trains running between Filton Abbey Wood and Bristol Temple Meads will be unable to stop at Stapleton Road or Lawrence Hill. However, trains running between Bristol Temple Meads and Clifton Down, Avonmouth or Severn Beach are unaffected.
Passengers travelling between Filton Abbey Wood and Stapleton Road or Lawrence Hill should change trains at Bristol Temple Meads.
This summer also sees essential track maintenance work taking place within the Severn Tunnel, which will be closed from Friday, June 9 to Sunday, June 18 for vital track replacement.
Passengers are advised to check before travelling between these dates, as a bus replacement service will be in operation between Bristol Parkway and Cardiff Central.
Latest: Opening date revealed for new Bristol railway station
£2.3 million Chippenham station transformation complete
Read more03.03.2026
Businesses hit as floods hit region
Read more05.01.2024
South West civic and business leaders recognised in New Years Honours list 2024
Read more02.01.2024
South West industry leaders meet in Swindon to discuss regional rail improvements
Read more02.11.2023
Bristol’s first new railway station in a century to open next week
Read more28.07.2023
Reading Green Park station opens this weekend
Read more25.05.2023
Bristol Temple Meads to become a testbed for passenger tech
Read more02.11.2022
Plans for new station for Devizes take a major step forward
Read more20.06.2022