Beard appointed for £25 million redevelopment of Bristol’s One Friary building
South West construction firm Beard has been appointed by development manager Bankfoot APAM to carry out the £25 million redevelopment of Bristol’s One Friary building.
The flagship project is – using 99.5 per cent of the building’s existing frame – being delivered on behalf of Britannia Invest A/S and is set to commence in April 2024.
Once complete, say Beard, it will provide 80,000 sq ft of best-in-class office accommodation in the heart of Temple Quay.
One Friary, a well-established office building situated opposite Bristol Temple Meads Railway Station, will undergo a comprehensive redevelopment, adding three new floors on top of the existing structure and the introduction of a new high-performance GRC façade.
Matt Cooper, Bristol director at Beard, said: “This exciting flagship project puts sustainability front and centre – the carbon savings through the reuse of the building’s existing structural frame will be significant.
“Drawing upon our extensive track record in sustainable redevelopment and our modern construction management skills, we are perfectly placed to deliver this project with Bankfoot APAM.”
Chris Moore, managing director of Bankfoot APAM, said: “One Friary is a prime example of our dedication to delivering sustainable workplaces, with One Friary in Bristol being one of a number of highly sustainable development schemes being delivered across the UK.
“We are hugely excited about the project and we believe it will be one of the best buildings to work in Bristol once finished.”
Latest: Beard director who joined as apprentice heralds National Apprenticeship Week
Beard Construction delivers £8.5 million in social and economic value – report
Read more19.05.2025
Construction firm Beard celebrates record year
Read more21.03.2025
Beard director who joined as apprentice heralds National Apprenticeship Week
Read more06.02.2025
Beard Construction raises £50,000 for local charities in 2024
Read more16.12.2024
Innovative modular housing scheme reaches final stage of construction in Bristol
Read more03.12.2024
Beard Construction chosen to lead Marlborough and Warminster Leisure Centre renovations
Read more07.10.2024
Former MD of Beard Construction dies aged 91
Read more20.08.2024
Construction firm Beard appoints social value manager
Read more23.07.2024